Schaubühne am Lehniner Platz, Berlin

Photo: © Arcaid Images / Stock Photo

Variable auditorium concept – flexible stage area

The Schaubühne Berlin is located in the heart of the city. It is a theatre with an extremely flexible auditorium concept. The stage area can be freely adjusted within the three available auditoriums. Our office was able to continuously manage refurbishment measures for the stage machinery, helping the theatre maintain long-term usability and high availability of its stage technology.

Client: BIM Berliner Immobilienmanagement GmbH
Project period: 07/2019 – 2021

Scope of services: Retrofit of point hoists, renewal of the stage control system, stage machinery
Oil change of all hydraulic platforms, repair work on hydraulic components

Client: State of Berlin, Senate Department for Urban Development

Architect: BAB Büro für Architektur und Baugeschichte

Project period: 2008 Expansion of the point hoist system, 2004 – 2006 (including partial inspections)
Scope of services: Stage machinery

Complete refurbishment

In 2007, Theater Engineering renewed the entire stage machinery of the Schaubühne at Lehniner Platz. The Schaubühne is a theatre with an extremely flexible auditorium concept. The stage area can be freely adjusted within the three available auditoriums.

Variable spatial arrangement through flexible auditorium machinery

For this performance concept, a correspondingly flexible system had to be designed. The existing point hoists were no longer safe and needed to be replaced. TE developed an adapted point hoist concept taking into account the existing room geometry. This allows the use of load points at any position within the auditorium. The existing machine rooms could continue to be used.

In total, 100 + 14 (later retrofitted) point hoist drives with the associated stage control system were installed. The control system takes into account the different variants of auditorium usage with regard to overarching functions, such as the emergency exit system.

The planning had to be completed within a tight schedule. The construction work was completed on time within an installation period of three months.

Specialist planning for the refurbishment of the stage control system

The Schaubühne Berlin relies heavily on a reliable stage control system. Due to the multifunctional auditorium concept of this theatre, all conceivable room configurations are realized through the lower and upper stage machinery. The objective for the refurbishment of the control system was therefore clear: a reliable stage control system that supports the implementation of the multifunctional auditorium concept in both setup and operation.

For this requirement, we were able to develop a precise planning and scope of services in a short period of time, based on detailed consultations with the user, comprehensive measurements, and our prior experience.

As a result, the refurbishment of the stage control system was completed within the specified time and cost framework during an extended performance break.