Theater Münster

Photo: © Wikipedia; Theater Münster

Modernization During Operating Seasons and Under Monument Protection

The Münster Theater consists of a large and a small venue and is a key cultural institution in the region. To ensure the continued presentation of a diverse and balanced program, modernization measures were required.

In particular, the renewal of the stage control system and the replacement of manual counterweight hoists in both venues significantly enhanced the theater’s technical capabilities. As part of the ATI-TMS joint venture, we planned and supervised the execution in two construction phases during operating seasons. The result was a substantial improvement in the performance of the stage machinery within a tight timeframe.

Client: Theater Münster
Execution: ARGE ATI – TMS

Project period: 01/2020 to 2022

Scope of services: Refurbishment of the stage machinery (fly and stage systems), stage engineering